MIL-DTL-12713E
TABLE III. Conformance inspection criteria.
Examination
Conformance Criteria
Requirement
Verification
or Test
Paragraph
Paragraph
Final assembly
VL-IV
3.2
4.3
Storage temperature
3 units per lot /1
3.3.1
4.4.1
Operating temperature
3 units per lot /1
3.3.2
4.4.2
End-for-end
100%
3.4
4.5
Micrometer
VL-IV
3.5
4.6
High angle shoes
VL-IV
3.6
4.7
Accuracy
100%
3.7
4.8
Torque
VL-IV
3.8
4.9, 4.4.2
Index alignment
VL-IV
3.9
4.10
Perpendicularity
VL-IV
3.10
4.11
Bubble size
VL-IV
3.11
4.12
Workmanship
VL-II
3.12
4.13
NOTES:
/1 Lot shall be accepted if there are 0 failures, and rejected if there are 1 or more failures.
4.2.2.4 Conformance rejection. If any item of the sample fails to comply with any
of the conformance requirements, the lot shall be rejected.
6
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business