MIL-DTL-12713E
TABLE II. First article inspection criteria.
Examination
Requirement
Verification
or Test
Paragraph
Paragraph
Final assembly
3.2
4.3
Storage temperature
3.3.1
4.4.1
Operating temperature
3.3.2
4.4.2
End-for-end
3.4
4.5
Micrometer
3.5
4.6
High angle shoes
3.6
4.7
Accuracy
3.7
4.8
Torque
3.8
4.9, 4.4.2
Index alignment
3.9
4.10
Perpendicularity
3.10
4.11
Bubble size
3.11
4.12
Workmanship
3.12
4.13
4.2.1.1 First article quantity. First article inspections shall be performed on three
(3) complete units.
4.2.1.2 First article inspection to be performed. The first article inspection shall be
performed in accordance with Table II.
4.2.1.3 First article rejection. If any item of the sample fails to comply with any of
the first article requirements, the first article shall be rejected.
4.2.2 Conformance inspection.
4.2.2.1 Lot formation. Lot formation shall be in accordance with the lot formation
requirements of MIL-STD-1916, paragraph "Formation and identification of lots and
batches."
4.2.2.2 Conformance inspection quantity. Conformance inspection quantities shall
be in accordance with Table III and MIL-STD-1916, paragraph "Sampling of lots or
batches." Conformance criteria shall be in accordance with Table III and MIL-STD-1916,
paragraph "Verification level (VL)."
4.2.2.3 Conformance inspection to be performed. The conformance inspection shall
be performed in accordance with Table III.
5
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business